Customer Case

250TPH Mobile Crusher Plant For Basalt Processing in Indonesia

Client Background

Our client is a leading quarry operator in Indonesia, specializing in high-quality basalt aggregates for construction and infrastructure projects. Facing increasing demand, they needed a high-efficiency, mobile crushing solution capable of processing 250 tons of basalt per hour.

250TPH Mobile Crusher Plant For Basalt Processing in Indonesia

Project Overview

The client required a turnkey mobile crushing system to process hard basalt stones into various sizes for road construction and concrete production. Key requirements included:

Challenges

  1. Hard Material Processing: Basalt is highly abrasive, demanding robust crushing equipment.
  2. Mobility Constraints: A fixed plant was not feasible due to multiple quarry locations.
  3. High Output Demand: The system needed to maintain consistent 250 TPH capacity under tough conditions.

Solution: Liming Heavy Industry’s NK Series Mobile Crushing Station

After analyzing the project needs, we recommended a mobile crushing plant combining:

1. NK Series Mobile Jaw Crusher (Primary Crushing)

2. NK Series Mobile Cone Crusher (Secondary Crushing)

3. Mobile Screening & Conveying System

Technical Highlights

Fully Mobile: Quick relocation between job sites
Automated Control: PLC system for operational efficiency
Dust Suppression: Eco-friendly processing
High Wear Resistance: Components designed for basalt hardness

Results & Benefits

250 TPH Production Target Achieved – Exceeded expectations with stable output.
Minimal Downtime – Robust design reduced maintenance needs.
Consistent Aggregate Quality – Well-graded crushed stones met road construction standards.

Client Feedback

“Liming Heavy Industry’s mobile crushing plant significantly improved our production efficiency. The NK mobile station worked perfectly in processing basalt at 250 TPH, and their HPT Cone Crusher delivered excellent particle shape. The mobility feature allows us to move the plant easily, reducing operational costs.”
Operations Director, PT. Indo Construction Group